Small plumbing jobs at fixed prices

Fixed prices for kitchen plumbing and appliances

Request common kitchen and laundry plumbing at clear fixed prices. See inclusions and conditions before sending your request.

Uddevalla · Trollhättan · Vänersborg

Kitchen and appliances

Choose the job you want to request.

All prices include VAT and the service vehicle within Trestad. ROT is provisional and requires eligibility.

Fixed price

Kitchen tap

1 995 SEKafter ROT tax deduction

  • Removal of existing tap
  • Fitting in the same position
  • Leak and function test

You supply the tap. New shut-off valves and special adaptations cost extra.

View details and book
Fixed price

Install a dishwasher

2 195 SEKafter ROT tax deduction

  • Water and drain connection
  • Leak check
  • Test run

Prepared, approved connections required. Electrical work and alterations excluded.

View details and book
Fixed price

Connect a washing machine

1 995 SEKafter ROT tax deduction

  • Water and drain connection
  • Leak check
  • Brief function test

Prepared, approved connections required. Electrical work and new pipes excluded.

View details and book
Fixed price

Fit a kitchen sink and tap

2 995 SEKafter ROT tax deduction

  • Removal of existing sink and tap
  • Fitting into an existing suitable cut-out
  • Water and drain connection with leak check

You supply sink, tap and drain parts. Existing suitable cut-out and working connections required. Cutting, drilling and worktop changes excluded.

View details and book
Fixed price

Install a countertop dishwasher

2 395 SEKincluding VAT

  • Disconnecting existing countertop dishwasher
  • Positioning and connecting to prepared water supply
  • Drain hose to sink and function test

You supply machine and hoses. Shut-off and approved water connection required. New tap connection, worktop holes, materials and fixed electrical work excluded.

View details and book
Fixed price

Connect a dryer to a drain

1 095 SEKincluding VAT

  • Disconnecting existing dryer
  • Positioning and connecting condensate to existing drain
  • Hose and function check

You supply dryer and connection hose. Clear floor space and prepared drain required. Stacking, new connections and fixed electrical work excluded.

View details and book

Does your job differ from the package?

Describe the job in the form. After sending it, use the email link to attach photos. H2OVS can assess the installation and confirm the price before starting.